Construction Management Exam Set (Falgun 13)

1. Which one of the following represents an activity

2. The technique for establishing and maintaining priorities among the various jobs of a project, is known

3. Mile Stone charts were invented in the year of

4. Frederick W. Taylor introduced a system of working known as

5. Pick up the PERT event from the following:

6. Final technical authority of a project lies with

7. The performance of a specific task in CPM, is known

8. Completion of an activity on CPM network diagram, is generally known

9. A dummy activity

10. Military organisation is known as

11. Various activities of a project, are shown on bar charts by

12. Critical Path Net Work helps an engineer

13. The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as

14. The artificial activity which indicates that an activity following it, cannot be started unless the preceding activity is complete, is known as

15. The most popular type of organisation used for Civil Engineering Constructions, is

16. The difference between the time avail-to do a job and the time required to do the job, is known as

17. Critical path lies along the activities having total float

18. A construction schedule is prepared after collecting

19. Site order book is used for recording

20. The main principle of an organisation, is

21. The estimated time required to perform an activity, is known as

22. The time which results in the leasi, possible construction cost of an activity, is known

23. Bar charts are suitable for

24. For the execution of a project, a contractor is

25. Railway projects are treated as