1.
A horizontal layer of brick laid in mortar is called
2.
The floor raised above the ground in a ground floor, allowing passage of air is:
3.
The highest point of an arch is called
4.
Workability of concrete is directly proportional to
5.
Stainless steel resists corrosion due to
6.
The standard size of A0 sheet size paper in metric system are:
7.
Trench plan of a building show:
9.
The necessary elements of estimate are:
10.
Accurate centering of plane table is done by:
11.
The reduced level of a point is its elevation with reference to :
12.
The number of links in a 30m metric chain is:
13.
The commonly used raw material in the manufacture of cement is:
14.
The method of damp proofing in which a layer of water repellent substance is provided between the source of dampness and part of structure adjacent to it is known as:
15.
Which one is correct?
16.
Constituent of paint that thins the consistency of the paint and evaporates once the film has been applied is called:
17.
The type of Iron obtained by melting pig iron with limestone and coke in cupola furnace is called:
18.
What is the minimum hook length to be provided in the stirrup?
19.
The waste water from kitchens, baths etc is called
20.
If the source of water is at an elevation than the service area, the water supply system is called
21.
The working edge of T-square is used to
22.
Types of estimate generally practiced in a project
23.
In rate analysis, contractor's profit and overhead is generally taken as ……….percentage of cost of work.
24.
During levelling, if backsight is more than foresight
25.
The constant vertical distance between two adjacent contours, is called
26.
The lower level of window where it rests is called
27.
The formwork from the sides of beams can be removed only after
28.
Which of the below is not an advantage of brick flooring:
29.
Pieces of stones are called
30.
What are different types of power supply system?
32.
The water supply pipe line should be tested at a specified pressure for
33.
The aquifer having least water bearing capacity is
34.
In an over-reinforced concrete section, the failure starts at:
35.
The cover provided in the column having size less than 200mm*200mm is
36.
The entrapped air in concrete
38.
In one day, the height of brick masonry construction should generally not exceed
39.
Le-chatelier's apparatus is used to carry out
40.
Minimum width of load bearing wall should be
41.
A cut in frame of a door to receive the shutter, is known as
42.
The vertical member running through middle of a shutter frame, is
43.
The black cotton soil
44.
The imaginary line passing through the intersection of cross hairs and the optical centre of the object is known as:
45.
The sag correction is always
46.
The slenderness of masonry walls should not be more
47.
The nominal lead and lift allowed for the earthwork in the excavations of the foundations are (NS norm):
48.
As built drawing is normally constructed……………
49.
The isometric length of the edge of cube is obtained by
50.
The main purpose of cavity wall is
I’m new here
best model question
First time giving such type of exam full set
I have selected right options as per we studied in the class notes but here I found 4 no. of mistakes after submission my result? and I want to say Please try to make model questions as per PSC syllabus marking here is 2/3 chapters are missing?